03 · IRB — the model, constrained
Art 142–191 CRR
Purpose & history
One factor, 99.9%, and everything that follows
The IRB formula is a single economic idea: portfolio losses driven by one systematic factor (the economy), with each obligor's sensitivity set by an asset correlation R. Conditional on a 99.9th-percentile bad year, the formula asks what default rate the portfolio suffers and charges capital for the unexpected part — expected loss belongs to provisioning, and the shortfall between EL and accounting provisions is deducted from CET1. Everything else on the panel is parameterisation of that idea: R falling with PD for corporates (bigger firms fail together, small ones idiosyncratically), fixed at 0.15 for mortgages (one housing market), 0.04 for QRRE; the maturity adjustment charging migration risk on longer paper; the 0.9997-style conservatism debates that never end.
The finalisation did not reject the model — it rejected estimating it where data cannot: entities with two defaults per generation (banks, mega-corporates) lost A-IRB; every surviving input gained a floor; and the 1.06 scalar — a 2004-era calibration patch — was finally deleted. What remains is the bargain Basel II should have offered: models where defaults are countable, discipline everywhere.
Requirements
Calculations
F-IRB corporate — the full formula, once
b = (0.11852 − 0.05478·ln PD)² = 0.1671
K = LGD·[N((G(PD) + √R·G(0.999))/√(1−R)) − PD] × (1+(M−2.5)·b)/(1−1.5·b)
= 0.40·[N(−1.294) − 0.005] × 1.334 = 0.40 × 0.0928 × 1.334 = 0.0495
RW = 12.5 × K ≈ 62% → RWA €6.19m (SA: €10m) · EL = PD×LGD = 0.20% → €20k vs provisions → shortfall to CET1 if under.
Changes & sources
| Change | Effect |
|---|---|
| A-IRB withdrawn (large corp., institutions) | Own-LGD advantage gone where defaults are unobservable |
| Equity → SA | All internal equity models retired |
| Input floors | PD 5bp (10bp QRRE revolvers), LGD/EAD floors per class |
| 1.06 scalar deleted | −5.7% RWA on all IRB books, mechanically |
| F-IRB senior unsecured LGD 45→40% | Partial offset to the constraints |
| Partial use liberalised | Permanent SA carve-outs by class without losing IRB elsewhere |
- Sources: Art 142–191; EBA IRB-repair GL suite (PD/LGD estimation, downturn, MoC); model-change RTS; TRIM decisions bank-by-bank.
- Watch: EBA monitoring of post-floor IRB incentives — early evidence some banks hand back approvals where the floor makes them pointless.
Independent analysis by Elderlake Partners, as at August 2026. Not legal, accounting or supervisory advice.